Client: Housing Hartlepool
Location: Hartlepool
Contract Value: £1.35m
Contract Period: Oct 2008 – April 2009
The scheme involved the demolition of existing flats and construction of 12 properties designed to a high standard of energy- saving measures.
The homes were designed by Esh Property Services partnering architect, HMH Architects.
The scheme is notable for two reasons, it was the first Housing Hartlepool project to be completed to the Code for Sustainable Homes Level 3 and it was the first in the North East, where the Homes and Community Agency grant funding was accessed by the developer, Esh Property Services.
The scheme was completed three weeks ahead of programme and achieved a 25% reduction in CO2 emissions over building regulation requirements.
Technical Aspects
• Innovative heating system with flue gas heat recovery device for improved efficiency
• Solar roof panels for hot water pre-heating
• High levels of insulation
• Warm floor construction
• Water and environmental management specification
• Recycling bin storage areas
• Water butts
• Passivent ventilation
• Masonry cladding
• Upgrading existing public footpaths & adjacent landscaping
• The scheme also has secure by design windows, doors, fencing and general site layout.